top of page

Alterations to the existing 16k sq. ft of space, including the breakout and reinstatement of the basement slab, where we created openings in the vault walls, formation of steps and a new concrete lift shaft. An overhaul of the service was carried out to the high standards of Polo Ralph Lauren.

​

Our works included:

​

  • Underpinning.

  • RC works.

  • Lift shaft installation.

  • Builder's work in connection (BWIC).

POLO RALPH LAUREN

LONDON, W1B

bottom of page