top of page


Alterations to the existing 16k sq. ft of space, including the breakout and reinstatement of the basement slab, where we created openings in the vault walls, formation of steps and a new concrete lift shaft. An overhaul of the service was carried out to the high standards of Polo Ralph Lauren.
​
Our works included:
​
-
Underpinning.
-
RC works.
-
Lift shaft installation.
-
Builder's work in connection (BWIC).
POLO RALPH LAUREN
LONDON, W1B
bottom of page